Mumbai Metro Line 9: MMRDA Floats Rs 626 Crore Tender To Build Car Shed At Uttan
Mumbai Metro: Tunnel Boring Begins On Line-7A's Twin Tunnels Planned For Direct Airport Connectivity
A 'Fail-Safe' Step: Mumbai Metro Insures All Commuters On Line 2A And 7
Mumbai: Metro Line 9 To Be Operational Next Year, To Have Two Interchange Stations At Dahisar East And Miragaon
PM Modi To Launch Projects Worth Rs 38,800 Crore In Mumbai On 19th January, Will Inaugurate Metro Line-2A And Line-7
Mumbai Metro: Line-2A (Dahisar To Andheri West DN Nagar) And Line-7 (Dahisar East To Andheri East) To Be Fully Operational Soon